883 tonnes detailed, fabricated, treated, delivered and installed at Bellevue
Fremantle Steel Group provided 883 tonnes of structural steel for the PTA Railcar Facility at Bellevue.
The package covered shop detailing, fabrication, treatment, delivery and installation. Managing these connected work stages allowed the manufactured steel to progress from the workshop to site within a coordinated delivery scope.
FSG’s involvement supported the construction of a major Western Australian rail manufacturing facility and demonstrated the group’s capacity to undertake substantial transport infrastructure packages through to site installation.
Scope
- 883 tonnes
- Shop detailing
- Structural steel fabrication
- Treatment
- Delivery
- Installation