Perth Airport Pedestrian Link Skybridge
Shop detailing, fabrication, treatment, delivery and installation of some 500 tonnes of bridge steel for the 280-metre elevated walkway linking Airport Central Station to T1 and T2.
Swan River Matagarup Pedestrian Bridge
Supply, fabrication, trial assembly, surface treatment, pre-assembly and delivery of the circa 1,000-tonne deck for WA’s landmark 3-span cable-stayed pedestrian bridge.



