Swan River Matagarup Pedestrian Bridge
Fremantle Steel Group helped deliver the deck for the landmark Matagarup Bridge, the pedestrian crossing linking East Perth with Optus Stadium. FSG’s scope covered the fabrication, trial assembly, surface treatment coordination, pre-assembly and delivery of about 500 tonnes of deck steel.
Margaret River Bridge
Shop detailing, fabrication, treatment, pre-assembly and delivery of 400 tonnes of steel bridges for the Margaret River perimeter road.
Perth Airport Pedestrian Link Skybridge
Shop detailing, fabrication, treatment, delivery and installation of 311 tonnes of bridge steel for the 280-metre elevated walkway linking Airport Central Station to T1 and T2.
PTA Railcar Facility Bellevue
Shop detailing, fabrication, treatment, delivery and installation of 883 tonnes of structural steel for the PTA railcar facility at Bellevue.
Rio Tinto Yandi Sustaining Project
Fabrication, treatment and delivery of 1,251 tonnes of structural steelwork and platework for the Yandi sustaining project in the Pilbara.
Tianqi Lithium Hydroxide Process Plant
Fabrication, treatment and delivery of 917 tonnes of structural steel for the pyromet, hydromet and piperacks of the Tianqi lithium hydroxide plant at Kwinana.
Kwinana Waste to Energy Plant
Supply, fabrication, surface treatment and delivery of 400 tonnes of structural steelwork for Australia's first large-scale waste-to-energy plant at Kwinana.
Rio Tinto Koodaideri Rail Bridge
Shop detailing, fabrication, treatment, delivery and installation of 400 tonnes of bridge steelwork for a Pilbara rail bridge.