Matagarup Bridge deck: trial-assembled at Jandakot before it went to the river

A look back at one of the group’s landmark packages: the fabrication, trial assembly, surface treatment coordination, pre-assembly and delivery of about 500 tonnes of deck steel for the Swan River Matagarup Pedestrian Bridge, the three-span cable-stayed bridge linking East Perth to the stadium precinct.

Trial-assembling the deck in the Jandakot yard proved the geometry and fit before the sections went to the river, so that erection could proceed without rework.

Posted on in Updates

Share