Locally fabricated steelwork for a major energy recovery facility
Fremantle Steel Group supplied approximately 400 tonnes of structural steelwork for the Kwinana Waste-to-Energy Plant.
FSG’s package included supply, fabrication, surface treatment and delivery. Bringing these activities together gave the project a coordinated local route from material supply through to completed steelwork arriving at the facility.
FSG’s involvement demonstrates the group’s ability to support complex energy and industrial developments with substantial structural packages manufactured in Western Australia.
Scope
- Approximately 400 tonnes
- Structural steel supply
- Fabrication
- Surface treatment
- Delivery
The Kwinana plant is one of Australia’s first large-scale waste-to-energy facilities.