Pre-assembled bridge steel delivered from Jandakot to the South West
Fremantle Steel Group delivered approximately 400 tonnes of steel bridges for the Margaret River Perimeter Bridge project.
The package brought together shop detailing, fabrication, treatment coordination, pre-assembly and delivery. By pre-assembling the steelwork before dispatch, FSG could check the completed components under controlled workshop conditions before transporting the package to the project site.
This end-to-end scope placed responsibility for the steelwork with one delivery team, from detailed fabrication information through to the pre-assembled components leaving the workshop.
Scope
- Approximately 400 tonnes of bridge steel
- Shop detailing
- Fabrication
- Treatment coordination
- Pre-assembly
- Delivery to Margaret River