Major Steel bridge fabrication through to installation in the Pilbara
Fremantle Steel Group delivered approximately 400 tonnes of structural steelwork for a rail bridge associated with the Rio Tinto Koodaideri, now Gudai-Darri, project.
FSG completed the shop detailing, fabrication and treatment before delivering and installing the bridge steelwork in the Pilbara. The package combined workshop manufacture with the logistics and installation requirements of a remote resources project.
By retaining responsibility through to installation, FSG provided continuity across the principal stages of the structural steel package.
Scope
- Approximately 400 tonnes
- Bridge structural steelwork
- Shop detailing
- Fabrication and treatment
- Delivery
- Installation