Tianqi Lithium Hydroxide Process Plant

Location

Kwinana WA

Sector

Resources & Mining

Status

Complete

917 tonnes for a lithium hydroxide plant at Kwinana

917 tonnes across three processing areas

Fremantle Steel Group fabricated, treated and delivered 917 tonnes of structural steel for the Tianqi Lithium Hydroxide Process Plant at Kwinana.

The package supported three distinct areas of the operation: the pyrometallurgical area, the hydrometallurgical area and the plant piperacks. FSG coordinated the fabrication and treatment of the different steelwork packages before delivering them to the project.

The result was a substantial locally manufactured structural package for a complex lithium processing facility within the Kwinana Strategic Industrial Area.

Scope

  • 917 tonnes
  • Pyrometallurgical area steelwork
  • Hydrometallurgical area steelwork
  • Piperacks
  • Fabrication
  • Treatment and delivery